Load the Flow Cell
| 1. | Remove the used flow cell from a previous run. |
| 2. | Align the flow cell over the alignment pins and place the flow cell on the stage. |
Load the Flow Cell

| 3. | Select Load. |
The door closes automatically, the flow cell ID appears on the screen, and the sensors are checked.
| 4. | Select Next. |
